How to create and apply a shift break template

UPDATE: The Manage Breaks tool is now underneath the "Schedule Tools" tab on the right-side of the calendar page. Please see screenshot below for exact placement.

Calendar Update Schedule Tools

 

To create a break template:

  1. In the left-hand toolbar, select SCHEDULE.
  2. Select CONFIGURE.
  3. Select BREAK.
  4. Click on ADD NEW BREAK.
  5. Name your break template in the NAME.
  6. Select a POSITION in the position drop-down menu.
  7. Enter the shift RANGE TIME to apply a break.
    1. For example, if you want to apply a 15 min. break to all shifts that are between 0-4 hours long then you will enter “0” hr. “0” min. TO “4” hrs. “0” min.
  8. In the BREAKS field create a BREAK NAME.
  9. Enter the number of minutes of the break length.
  10. If it’s a PAID break, click on the checkbox.
  11. If you’d like to add another break within this range of time, then click the green ADD button and repeat steps 8-10.
    1. Using the same example above, if you offer two paid or non-paid breaks 15 min. breaks within the 4-hr. shift time.
  12. Click SAVE.